应氏

NEWS CENTER

Check category

Taizhou Yingshi environmental protection equipment Co., Ltd. annual output 150000 sets of environmental protection air conditioning technology transformation project completion environmental protection facilities acceptance notice

(Summary description)Taizhou Yingshi environmental protection equipment Co., Ltd. annual output 150000 sets of environmental protection air conditioning technology transformation project completion environmental protection facilities acceptance notice。

Taizhou Yingshi environmental protection equipment Co., Ltd. annual output 150000 sets of environmental protection air conditioning technology transformation project completion environmental protection facilities acceptance notice

(Summary description)Taizhou Yingshi environmental protection equipment Co., Ltd. annual output 150000 sets of environmental protection air conditioning technology transformation project completion environmental protection facilities acceptance notice。

Information
According to the relevant requirements of environmental management, Taizhou Yingshi environmental protection equipment Co., Ltd. has carried out the acceptance and monitoring of environmental protection facilities after the completion of the 150000 sets of environmental protection air conditioning technology transformation project, and now the relevant situation of project acceptance is publicized. During the publicity period, if you have any questions about the pollution of the project, or think that the construction of the project may have a significant impact on your work, production and living environment, please report to our company by phone, letter or other means and submit written opinions within the publicity period.
1. Publicity time: August 13, 2018 to September 7, 2018
2. Contact number during publicity: he Jiping / 18006863615
3. Mailing address: No. 350, Haifeng Road, Taizhou City zip code: 318000
4. Email: 18006863615@189.com
(1) Construction site, scale and main construction contents
Taizhou Yingshi environmental protection equipment Co., Ltd. (hereinafter referred to as "Yingshi environmental protection") is located at No. 350, Haifeng Road, Taizhou city. It covers an area of 253925m2, with an actual total investment of 20 million yuan. It purchases advanced oven, injection molding machine and other equipment, mainly processes and assembles plastic parts (plastic shell, air duct, louver, fan blade) of environmental protection air conditioner. After the completion of the project, it has an annual output of 150000 sets of environmental protection air conditioners Production capacity.
On April 13, 2015, the enterprise obtained the notice of project filing (technical transformation) from Taizhou Economic Development Zone Economic Development Bureau (tkxb [2015] No.07). In August 2015, the enterprise entrusted Taizhou Environmental Science Design and Research Institute to prepare the environmental impact report form for the annual production of 150000 sets of environmental protection air conditioning technology transformation project of Taizhou Yingshi environmental protection air conditioning technology Co., Ltd., and on October 23, 2015, the enterprise obtained the environmental assessment permit decision of the project issued by Taizhou Environmental Protection Bureau (Document No.: tkhj [2015] No. 53).
At present, the main works and supporting environmental protection facilities of the project have been in normal operation at the same time. There is no environmental complaint, violation or punishment record in the process of project initiation and commissioning.
Taizhou Yingshi environmental protection equipment Co., Ltd. has an annual output of 150000 sets of environmental protection air conditioning technology transformation project. During the project construction, according to the relevant requirements of "three Simultaneities" of environmental protection of the construction project, the environmental protection facilities and relevant measures required in the EIA report and the reply have been implemented. After the completion and operation of the project, the discharge of waste water, waste gas and noise meet the requirements of relevant national standards, the solid waste is properly disposed, and the acceptance conditions of environmental protection facilities for the completion of the construction project are met. The acceptance team agreed that the project passed the environmental protection acceptance.

Scan the QR code to read on your phone

Previous: None
Previous: None

Copyright 2019  Taizhou Ying’s Environmental Protection Equipment Co. Ltd.  浙ICP备17004795号  Power:300.cn